|

|
Step 2-
Assemble the Peak Center pole (2B/1) with the Roof center hub and
the Roof end hub. Then attach the Shock Corded roof pole (2B/2) to
the roof end hub, as shown in Diagram 2. Connect poles, 7B-7-7B,
hook the Supporting pole by snapping the hook to the Roof center
pole, and cave pole, as shown in Diagram 2.
|
|
Step 5-
Secure the Screen house down by inserting the hooks, #C, located on
the outside lower corners of the screen house, to one of the three
holes in the leg pole. Secure the screen house to the frame by
buckling the tabs, #D, around the poles. Secure the screen house
down to the ground by inserting the stakes through the loops and D-
rings. The stake loops are located at #E, and the D- rings are
located at # F. If you are setting this screen house on a deck or
concrete you may hook the D-rings to the plastic base or attach a
weight, or sand bag to the D-rings.
Step 6-
Tie the loose end of each guy line to the D- rings
located on the top corners of the screen house roof, #G. On the
other end of the guy line extend the loop and stake it 3ft from the
corner base of the screen house. Adjust the tension of the guy line
with the slider. You may also tie the guy lines to a tree or fence
for extra support.
|