|
Step 5-
Secure the Screen house down by inserting the hooks, #C, located on the
outside lower corners of the screen house, to one of the three holes in
the leg pole. Secure the screen house to the frame by buckling the tabs,
#D, around the poles. Secure the screen house down to the ground by
inserting the stakes through the loops and D- rings. The stake loops are
located at #E, and the D- rings are located at # F. If you are setting
this screen house on a deck or concrete you may hook the D-rings to the
plastic base or attach a weight, or sand bag to the D-rings.
Step 6-
Tie the loose end of each guy line to the D- rings located on the top
corners of the screen house roof, #G. On the other end of the guy line
extend the loop and stake it 3ft from the corner base of the screen
house. Adjust the tension of the guy line with the slider. You may also
tie the guy lines to a tree or fence for extra support.
|